our work

Proven results across commercial construction projects

project portfolio

Explore APMI’s commercial construction projects throughout Western Massachusetts, including site development, paving, utilities, excavation, and infrastructure work.

FedEx – Bradley International Airport

Project Duration: 4 Months

Challenge
FedEx turned to APMI after the original general contractor fell significantly behind schedule and the project costs had escalated well beyond budget. The project required immediate leadership, coordination, and technical expertise to get it back on track.

APMI Solution
APMI quickly assembled a specialized team of engineers, project managers, and field personnel to re-engineer the mechanical, electrical, and plumbing (MEP) systems. Through strategic planning, cost controls, and disciplined execution, APMI regained control of the project and restored confidence with the client.

Results
The project was completed within the original delivery schedule while bringing costs back under control, allowing FedEx to move forward without further delays.

Baystate Health – Major Parking Lot Renovation

Project Duration: 9 Months

Challenge
Baystate Health needed to significantly increase parking capacity while improving traffic flow, pedestrian safety, and the overall appearance of the campus. Conventional engineering suggested the available space was limited due to presumed wetland restrictions.

APMI Solution
Working closely with Baystate’s engineering team, APMI redesigned the site, reevaluated stormwater management, and successfully demonstrated that additional usable land existed beyond the previously assumed wetland boundaries. The redesign maximized available real estate while enhancing site safety and functionality.

Results
The completed project created approximately 150 additional parking spaces, improved pedestrian circulation, upgraded the facility’s exterior appearance, and delivered a safer, more efficient parking environment for patients, visitors, and staff.

Town of Westford – PFAS Water Treatment Upgrades

Project Duration: 18 Months

Challenge
As part of the Town of Westford’s PFAS water treatment improvements, APMI partnered with R.H. White to perform all civil sitework and underground infrastructure required to support the new treatment facilities. The project demanded exceptional coordination while maintaining strict safety standards.

APMI Solution
Working alongside R.H. White, APMI managed the complete civil construction scope, including site development, underground utilities, grading, drainage, and infrastructure installation. Throughout the project, both teams maintained an unwavering commitment to safety, quality, and schedule.

Results
The project was completed safely, on schedule, and to the high standards expected by both the Town of Westford and our project partners, helping deliver critical water infrastructure improvements to the community.

industries served

retail

Shopping centers, storefronts, and retail developments.

office

Professional office buildings and corporate campuses.

industrial

Warehouses, distribution centers, and manufacturing facilities.

Private Development

Mixed-use, multi-family, and private commercial developments.

aviation

Airports, aviation facilities, hangars, and airfield infrastructure projects.

our capabilities

heavy equipment fleet

Excavators, dozers, loaders, graders, and dump trucks — owned and maintained in-house.

experienced crews

Complete site preparation including grading, utilities, stormwater management, and infrastructure development.

scalable operations

From small site work to large-scale commercial developments, we scale to meet project demands.